Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Nordstetten Light Rail: Difference between revisions

From 1F616EMO Survival Server Wiki
mNo edit summary
No edit summary
Tag: 2017 source edit
 
(2 intermediate revisions by the same user not shown)
Line 4: Line 4:
| line_number =
| line_number =
* {{rcb|Nordstetten Light Rail|1}}
* {{rcb|Nordstetten Light Rail|1}}
* {{rcb|Nordstetten Light Rail|2}}
| began_operation = {{start date|2024|03}}
| began_operation = {{start date|2024|03}}
| operator = [[Nordstettener Eisenbahngesellschaft]]
| operator = [[Nordstettener Eisenbahngesellschaft]]
Line 9: Line 10:
}}
}}
'''Nordstetten Light Rail''' is the light rail network of [[Nordstetten]].
'''Nordstetten Light Rail''' is the light rail network of [[Nordstetten]].
== History ==
The first rail line in Nordstetten was the section between {{stl|Nordstetten Light Rail|Eulerstraße}} and {{stl|Nordstetten Light Rail|Industriestraße}}, which was built as {{p|y5nw}} moved away from the island he originally settled on. The line was initially built with two separate tracks, each occupied by a single train: the eastbound track was occupied by a set of 01700 series train, and the westbound track was occupied by a train consisting of two gondola wagons,<ref>https://t.me/emo_minetest/3711</ref> the latter of which was (in addition to freight transportation) also used as a temporary storage. Both trains were eventually moved off the tracks as the line was later extended and opened to passenger service.
The line was extended to the south to {{stl|Nordstetten Light Rail|Wörther Straße}} in March 2024 as the city expanded. Line 1 was then opened and ran between Wörther Straße and Eulerstraße. The line was further extended to {{Station|Have Idea}} in cooperation with {{p|1F616EMO}}.
The line along [[Hagenauer Straße, Nordstetten|Hagenauer Straße]] was construted around the same time as the Wörther Straße station, although it only led to the [[Landauer Straße Rail Yard]] at the time. The extension to {{stl|Nordstetten Light Rail|Apfelbühl}} was built around August 2024 along with the [[Nordstetten Mainline]]. Line 1 was then rerouted to Apfelbühl. A connection between Apfelbühl and Eulerstraße was also built to avoid long traveling times, and Line 2 was opened along the Apfelbühl - Eulerstraße - Wörther Straße route.
The development of the city followed the construction of the line along Hagenauer Straße. In particular, a freight line was built along the parallel [[Seltzer Straße,Nordstetten|Seltzer Straße]] as factories were built. Freight transportation along the line started on 9 November 2024.

Latest revision as of 17:36, 9 November 2024

Nordstetten Light Rail
Overview
Area servedNordstetten
Transit typeLight rail
Line number
Operation
Began operationMarch 2024 (2024-03)
Operator(s)Nordstettener Eisenbahngesellschaft
Rolling stockKonstal 105

Nordstetten Light Rail is the light rail network of Nordstetten.

History

The first rail line in Nordstetten was the section between Eulerstraße and Industriestraße, which was built as y5nw moved away from the island he originally settled on. The line was initially built with two separate tracks, each occupied by a single train: the eastbound track was occupied by a set of 01700 series train, and the westbound track was occupied by a train consisting of two gondola wagons,[1] the latter of which was (in addition to freight transportation) also used as a temporary storage. Both trains were eventually moved off the tracks as the line was later extended and opened to passenger service.

The line was extended to the south to Wörther Straße in March 2024 as the city expanded. Line 1 was then opened and ran between Wörther Straße and Eulerstraße. The line was further extended to Have Idea in cooperation with 1F616EMO.

The line along Hagenauer Straße was construted around the same time as the Wörther Straße station, although it only led to the Landauer Straße Rail Yard at the time. The extension to Apfelbühl was built around August 2024 along with the Nordstetten Mainline. Line 1 was then rerouted to Apfelbühl. A connection between Apfelbühl and Eulerstraße was also built to avoid long traveling times, and Line 2 was opened along the Apfelbühl - Eulerstraße - Wörther Straße route.

The development of the city followed the construction of the line along Hagenauer Straße. In particular, a freight line was built along the parallel Seltzer Straße as factories were built. Freight transportation along the line started on 9 November 2024.

Contents