More actions
mNo edit summary |
No edit summary Tag: 2017 source edit |
||
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
| line_number = | | line_number = | ||
* {{rcb|Nordstetten Light Rail|1}} | * {{rcb|Nordstetten Light Rail|1}} | ||
* {{rcb|Nordstetten Light Rail|2}} | |||
| began_operation = {{start date|2024|03}} | | began_operation = {{start date|2024|03}} | ||
| operator = [[Nordstettener Eisenbahngesellschaft]] | | operator = [[Nordstettener Eisenbahngesellschaft]] | ||
Line 9: | Line 10: | ||
}} | }} | ||
'''Nordstetten Light Rail''' is the light rail network of [[Nordstetten]]. | '''Nordstetten Light Rail''' is the light rail network of [[Nordstetten]]. | ||
== History == | |||
The first rail line in Nordstetten was the section between {{stl|Nordstetten Light Rail|Eulerstraße}} and {{stl|Nordstetten Light Rail|Industriestraße}}, which was built as {{p|y5nw}} moved away from the island he originally settled on. The line was initially built with two separate tracks, each occupied by a single train: the eastbound track was occupied by a set of 01700 series train, and the westbound track was occupied by a train consisting of two gondola wagons,<ref>https://t.me/emo_minetest/3711</ref> the latter of which was (in addition to freight transportation) also used as a temporary storage. Both trains were eventually moved off the tracks as the line was later extended and opened to passenger service. | |||
The line was extended to the south to {{stl|Nordstetten Light Rail|Wörther Straße}} in March 2024 as the city expanded. Line 1 was then opened and ran between Wörther Straße and Eulerstraße. The line was further extended to {{Station|Have Idea}} in cooperation with {{p|1F616EMO}}. | |||
The line along [[Hagenauer Straße, Nordstetten|Hagenauer Straße]] was construted around the same time as the Wörther Straße station, although it only led to the [[Landauer Straße Rail Yard]] at the time. The extension to {{stl|Nordstetten Light Rail|Apfelbühl}} was built around August 2024 along with the [[Nordstetten Mainline]]. Line 1 was then rerouted to Apfelbühl. A connection between Apfelbühl and Eulerstraße was also built to avoid long traveling times, and Line 2 was opened along the Apfelbühl - Eulerstraße - Wörther Straße route. | |||
The development of the city followed the construction of the line along Hagenauer Straße. In particular, a freight line was built along the parallel [[Seltzer Straße,Nordstetten|Seltzer Straße]] as factories were built. Freight transportation along the line started on 9 November 2024. |