More actions
No edit summary Tag: 2017 source edit |
No edit summary Tag: 2017 source edit |
||
Line 19: | Line 19: | ||
The line along [[Hagenauer Straße, Nordstetten|Hagenauer Straße]] was construted around the same time as the Wörther Straße station, although it only led to the [[Landauer Straße Rail Yard]] at the time. The extension to {{stl|Nordstetten Light Rail|Apfelbühl}} was built around August 2024 along with the [[Nordstetten Mainline]]. Line 1 was then rerouted to Apfelbühl. A connection between Apfelbühl and Eulerstraße was also built to avoid long traveling times, and Line 2 was opened along the Apfelbühl - Eulerstraße - Wörther Straße route. | The line along [[Hagenauer Straße, Nordstetten|Hagenauer Straße]] was construted around the same time as the Wörther Straße station, although it only led to the [[Landauer Straße Rail Yard]] at the time. The extension to {{stl|Nordstetten Light Rail|Apfelbühl}} was built around August 2024 along with the [[Nordstetten Mainline]]. Line 1 was then rerouted to Apfelbühl. A connection between Apfelbühl and Eulerstraße was also built to avoid long traveling times, and Line 2 was opened along the Apfelbühl - Eulerstraße - Wörther Straße route. | ||
The development of the city followed the construction of the line along Hagenauer Straße. In particular, a freight line was built along the parallel Seltzer Straße as factories were built. Freight transportation along the line started on 9 November 2024. | The development of the city followed the construction of the line along Hagenauer Straße. In particular, a freight line was built along the parallel [[Seltzer Straße,Nordstetten|Seltzer Straße]] as factories were built. Freight transportation along the line started on 9 November 2024. |